PROMSA is a company of the Cementos Molins Group | Corporate web Site
3 slabs were made for this multi-family building located in Quart (Girona).
250m3 of HA25 concrete was supplied by soft consistency slab with fluid finish (with a total of 3 slabs).
All the concrete was pumped by the Promsa pumping service.
In January 2012, Promsa installed an on-site plant to supply the necessary products for the works of Mango’s logistic complex located in Lliçà d’Amunt (Barcelona).
These works included: urbanisation (drains, gutters, etc.), screen walls, foundations, structure of the logistics warehouse, etc.
A large amount of pumping and the application of high planimetry pavements were also carried out.
Promsa’s structures department has participated in the extension of the factory of a well-known beer brand located in the Baix Llobregat.
Particularly, the construction of a foundation slab of 700 m3 to support the 40 cm-wide circular walls to support the silos.
For this project, we also used Promsa’s concrete pump.
Curved Wall: 2,100 m2.
Concrete: 1,700 m3.
In 2008, Promsa installed in La Sagrera an on-site plant to supply the products for the new station of La Sagrera.
Since them, this concrete plant has manufactured the necessary products for wells, piles, screen walls, ballastless track, mortar for the tunnel (applied with tunnel borer), etc.
This plant continues being active and it has produced over 450,000 m3 of concrete and mortar.
In 2008 Promsa installed in Sarrià de Ter (Girona) an on-site plant to supply the products for the construction of the AVE section between Girona-Border with France.
These works included the construction of 2 tunnels.
The products supplied were mainly shotcrete (gunite) as well as structural concrete.
Promsa’s Structures department, carried out in 2017 this external stairs located in Llançà.
This is a very complex job due to the access difficulty.
The concreting was done by pumping.
In 2007 Promsa installed in Cornellà de Terri (Girona) an on-site plant to supply the products for the construction of the AVE section between Girona-Border with France.
These works included the construction of 2 tunnels and a viaduct.
The products supplied were mainly shotcrete, mass and structural concrete.
Different Promsa products were used for the construction of the Grimaldi terminal.
Concrete was used for the structure of the offices, foundations and pavements.
Flexotraction concrete was also supplied to build pavements that had to support more weight and required high resistance.